Difference between revisions of "Template:Infobox future infrastructure project/doc"
Jump to navigation
Jump to search
imported>KevCor360 (added footnotes section to documentation for c&p) |
imported>Vanisaac m (→See also: clean up per WP:CAT#T and WP:AWBREQ add template:Sandbox other) |
||
| (3 intermediate revisions by 3 users not shown) | |||
| Line 9: | Line 9: | ||
|proposer = [[Norfolk County Council]] | |proposer = [[Norfolk County Council]] | ||
|estimated cost = £117 (2009) | |estimated cost = £117 (2009) | ||
| − | |stakeholders = [[Campaign for better transport]], No to N25, [[Norfolk County Council]] | + | |stakeholders = [[Campaign for Better Transport (United Kingdom)|Campaign for better transport]], No to N25, [[Norfolk County Council]] |
}} | }} | ||
| Line 41: | Line 41: | ||
==Notes== | ==Notes== | ||
| + | |||
===Applicability=== | ===Applicability=== | ||
| − | This template can be used to provide structured details of an infrastructure project that is planned or under construction. This is distinct from the completed project which might have its own infobox. For example a motorway may have been built and expanded in a number of separate projects | + | This template can be used to provide structured details of an infrastructure project that is planned or under construction. This is distinct from the completed project which might have its own infobox. For example, a motorway may have been built and expanded in a number of separate projects – the motorway would have an infobox and the construction projects may also have separate infoboxes. |
The footnotes section may be omitted if there are none. | The footnotes section may be omitted if there are none. | ||
===Field usage=== | ===Field usage=== | ||
| − | The usage of fields and the infobox is still being [[ | + | The usage of fields and the infobox is still being [[Template talk:Infobox future infrastructure project|discussed]] however here are some proposed values for fields. |
| − | *status : aspiration/planned/approved/withdrawn/shelved/under_construction/completed | + | * status: aspiration/planned/approved/withdrawn/shelved/under_construction/completed |
| − | *type : road/rail/airport/building etc | + | * type: road/rail/airport/building etc. |
== See also == | == See also == | ||
{{Buildings and structures infobox templates}} | {{Buildings and structures infobox templates}} | ||
| − | <includeonly>{{ | + | <includeonly>{{Sandbox other|| |
<!-- Categories below this line, please; interwikis at Wikidata --> | <!-- Categories below this line, please; interwikis at Wikidata --> | ||
[[Category:Buildings and structures infobox templates|Future infrastructure project]] | [[Category:Buildings and structures infobox templates|Future infrastructure project]] | ||
[[Category:Infrastructure templates]] | [[Category:Infrastructure templates]] | ||
}}</includeonly> | }}</includeonly> | ||
Latest revision as of 19:34, 25 April 2020
| This is a documentation subpage for Template:Infobox future infrastructure project. It contains usage information, categories and other content that is not part of the original template page. |
![]() Proposed Route of the N25, showing location of new town and railway station | |
| Location | Norwich |
|---|---|
| Proposer | Norfolk County Council |
| Cost estimate | £117 (2009) |
| Stakeholders | Campaign for better transport, No to N25, Norfolk County Council |
Usage
The template text may be copied and pasted to the article as needed. There are no mandatory fields. All fields accept text strings.
{{Infobox future infrastructure project
|property_name =
|location =
|proposer =
|official website =
|status =
|type =
|estimated cost =
|max cost =
|min cost =
|planned start =
|planned finish =
|image_name =
|image_size =
|caption =
|osm_id =
|supporters =
|stakeholders =
|opponents =
|geometry =
|footnotes =
}}
Notes
Applicability
This template can be used to provide structured details of an infrastructure project that is planned or under construction. This is distinct from the completed project which might have its own infobox. For example, a motorway may have been built and expanded in a number of separate projects – the motorway would have an infobox and the construction projects may also have separate infoboxes.
The footnotes section may be omitted if there are none.
Field usage
The usage of fields and the infobox is still being discussed however here are some proposed values for fields.
- status: aspiration/planned/approved/withdrawn/shelved/under_construction/completed
- type: road/rail/airport/building etc.
See also
