Difference between revisions of "Template:Infobox canal/doc"
Jump to navigation
Jump to search
imported>Dave Rave |
imported>BIL (→Usage: I add some parameters which already exist in the main template) |
||
| Line 35: | Line 35: | ||
| len_ft = | | len_ft = | ||
| len_in = | | len_in = | ||
| + | | len_m = | ||
| o_len_ft = | | o_len_ft = | ||
| o_len_in = | | o_len_in = | ||
| + | | o_len_m = | ||
| len_note = | | len_note = | ||
| beam_ft = | | beam_ft = | ||
| beam_in = | | beam_in = | ||
| + | | beam_m = | ||
| o_beam_ft = | | o_beam_ft = | ||
| o_beam_in = | | o_beam_in = | ||
| + | | o_beam_m = | ||
| beam_note = | | beam_note = | ||
| + | | min_boat_draft = | ||
| + | | min_boat_air_draft = | ||
| start = | | start = | ||
| o_start = | | o_start = | ||
| Line 56: | Line 62: | ||
| lock_note = | | lock_note = | ||
| length_mi = | | length_mi = | ||
| + | | length_km = | ||
| o_length_mi = | | o_length_mi = | ||
| + | | o_length_km = | ||
| length_note = | | length_note = | ||
| elev_ft = | | elev_ft = | ||
| + | | elev_m = | ||
| elev_note = | | elev_note = | ||
| status = | | status = | ||
| Line 89: | Line 98: | ||
| len_ft = GAUGE LENGTH IN FEET | | len_ft = GAUGE LENGTH IN FEET | ||
| len_in = GAUGE LENGTH INCHES | | len_in = GAUGE LENGTH INCHES | ||
| + | | len_m = GAUGE LENGTH METERS (use either meters or ft+in) | ||
| o_len_ft = ORIGINAL GAUGE LENGTH IN FEET | | o_len_ft = ORIGINAL GAUGE LENGTH IN FEET | ||
| o_len_in = ORIGINAL GAUGE LENGTH INCHES | | o_len_in = ORIGINAL GAUGE LENGTH INCHES | ||
| + | | o_len_m = ORIGINAL GAUGE LENGTH METERS | ||
| len_note = NOTES TO GAUGE LENGTH | | len_note = NOTES TO GAUGE LENGTH | ||
| beam_ft = GAUGE BEAM IN FEET | | beam_ft = GAUGE BEAM IN FEET | ||
| beam_in = GAUGE BEAM INCHES | | beam_in = GAUGE BEAM INCHES | ||
| + | | beam_m = GAUGE BEAM METERS | ||
| o_beam_ft = ORIGINAL GAUGE BEAM IN FEET | | o_beam_ft = ORIGINAL GAUGE BEAM IN FEET | ||
| o_beam_in = ORIGINAL GAUGE BEAM INCHES | | o_beam_in = ORIGINAL GAUGE BEAM INCHES | ||
| + | | o_beam_m = ORIGINAL GAUGE BEAM METERS | ||
| beam_note = NOTES TO GAUGE BEAM | | beam_note = NOTES TO GAUGE BEAM | ||
| + | | min_boat_draft = DRAFT PERMITTED FOR BOATS | ||
| + | | min_boat_air_draft = AIR DRAFT PERMITTED FOR BOATS | ||
| start = START POINT | | start = START POINT | ||
| o_start = ORIGINAL START POINT | | o_start = ORIGINAL START POINT | ||
| Line 109: | Line 124: | ||
| o_locks = ORIGINAL NUMBER OF LOCKS | | o_locks = ORIGINAL NUMBER OF LOCKS | ||
| lock_note = NOTE TO NUMBER OF LOCKS | | lock_note = NOTE TO NUMBER OF LOCKS | ||
| − | | length_mi = LENGTH OF CANAL IN MILES | + | | length_mi = LENGTH OF CANAL IN MILES (use either km or miles) |
| + | | length_km = LENGTH OF CANAL IN KILOMETERS | ||
| o_length_mi = ORIGINAL LENGTH OF CANAL IN MILES | | o_length_mi = ORIGINAL LENGTH OF CANAL IN MILES | ||
| + | | o_length_km = ORIGINAL LENGTH OF CANAL IN KILOMETERS | ||
| length_note = NOTE TO CANAL LENGTH | | length_note = NOTE TO CANAL LENGTH | ||
| elev_ft = MAXIMUM HEIGHT ABOVE SEA LEVEL IN FEET | | elev_ft = MAXIMUM HEIGHT ABOVE SEA LEVEL IN FEET | ||
| + | | elev_m = MAXIMUM HEIGHT ABOVE SEA LEVEL IN METERS | ||
| elev_note = NOTE TO MAXIMUM HEIGHT ABOVE SEA LEVEL | | elev_note = NOTE TO MAXIMUM HEIGHT ABOVE SEA LEVEL | ||
| status = OPEN/CLOSED/INFILLED/UNDER RESTORATION | | status = OPEN/CLOSED/INFILLED/UNDER RESTORATION | ||
Revision as of 18:28, 8 August 2017
| This is a documentation subpage for Template:Infobox canal. It contains usage information, categories and other content that is not part of the original template page. |
This template is part of the UK Waterways WikiProject.
Contents
Usage
- All parameters are optional.
- No caption will be shown if there is no image.
- The default image size is 288 px
- units should be entered in feet and inches.
- Include the HTML comments before and following the template; they help inexperienced editors.
- Please spend some time at the UK Waterways WikiProject article and its talk page for standards on presenting names and other data.
The following few lines create the "Infobox" table template. Please scroll down to edit the main content of the article.
Simple version{{Infobox canal
| name =
| image =
| image_size =
| caption =
| o_name =
| m_name =
| company =
| engineer =
| a_engineer =
| date_act =
| date_const =
| date_use = <!-- {{Start date|YYYY}} -->
| date_comp =
| date_ext =
| date_closed =
| date_rest =
| len_ft =
| len_in =
| len_m =
| o_len_ft =
| o_len_in =
| o_len_m =
| len_note =
| beam_ft =
| beam_in =
| beam_m =
| o_beam_ft =
| o_beam_in =
| o_beam_m =
| beam_note =
| min_boat_draft =
| min_boat_air_draft =
| start =
| o_start =
| start_note =
| end =
| o_end =
| end_note =
| branch =
| branch_of =
| join =
| locks =
| o_locks =
| lock_note =
| length_mi =
| length_km =
| o_length_mi =
| o_length_km =
| length_note =
| elev_ft =
| elev_m =
| elev_note =
| status =
| nav =
}}
|
Details{{Infobox canal
| name = NAME OF CANAL
| image = IMAGE OF CANAL
| image_size = IMAGE SIZE
| caption = IMAGE CAPTION
| o_name = ORIGINAL NAME OF CANAL (IF DIFFERENT TO name)
| m_name = MODERN NAME OF CANAL (IF DIFFERENT TO name)
| company = ORIGINAL CANAL COMPANY
| engineer = PRINCIPAL ENGINEER
| a_engineer = OTHER ENGINEERS
| date_act = DATE OF ACT OF PARLIAMENT
| date_const = DATE CONSTRUCTION BEGAN
| date_use = DATE OF FIRST COMMERCIAL USE
| date_comp = DATE COMPLETED
| date_ext = DATE EXTENDED
| date_closed = DATE CLOSED
| date_rest = DATE RESTORED
| len_ft = GAUGE LENGTH IN FEET
| len_in = GAUGE LENGTH INCHES
| len_m = GAUGE LENGTH METERS (use either meters or ft+in)
| o_len_ft = ORIGINAL GAUGE LENGTH IN FEET
| o_len_in = ORIGINAL GAUGE LENGTH INCHES
| o_len_m = ORIGINAL GAUGE LENGTH METERS
| len_note = NOTES TO GAUGE LENGTH
| beam_ft = GAUGE BEAM IN FEET
| beam_in = GAUGE BEAM INCHES
| beam_m = GAUGE BEAM METERS
| o_beam_ft = ORIGINAL GAUGE BEAM IN FEET
| o_beam_in = ORIGINAL GAUGE BEAM INCHES
| o_beam_m = ORIGINAL GAUGE BEAM METERS
| beam_note = NOTES TO GAUGE BEAM
| min_boat_draft = DRAFT PERMITTED FOR BOATS
| min_boat_air_draft = AIR DRAFT PERMITTED FOR BOATS
| start = START POINT
| o_start = ORIGINAL START POINT
| start_note = NOTES TO START POINT
| end = END POINT
| o_end = ORIGINAL END POINT
| end_note = NOTES TO END POINT
| branch = NAMES OF ANY CANALS THAT ARE BRANCHES OF THIS CANAL
| branch_of = NAME OF THE CANAL THAT THIS CANAL IS A BRANCH OF
| join = NAME OF ANY CANAL THAT THIS CANAL HAS A JUNCTION WITH
| locks = NUMBER OF LOCKS
| o_locks = ORIGINAL NUMBER OF LOCKS
| lock_note = NOTE TO NUMBER OF LOCKS
| length_mi = LENGTH OF CANAL IN MILES (use either km or miles)
| length_km = LENGTH OF CANAL IN KILOMETERS
| o_length_mi = ORIGINAL LENGTH OF CANAL IN MILES
| o_length_km = ORIGINAL LENGTH OF CANAL IN KILOMETERS
| length_note = NOTE TO CANAL LENGTH
| elev_ft = MAXIMUM HEIGHT ABOVE SEA LEVEL IN FEET
| elev_m = MAXIMUM HEIGHT ABOVE SEA LEVEL IN METERS
| elev_note = NOTE TO MAXIMUM HEIGHT ABOVE SEA LEVEL
| status = OPEN/CLOSED/INFILLED/UNDER RESTORATION
| nav = NAVIGATION AUTHORITY
}}
|
Example
| Bogcaster Canal | |
|---|---|
![]() | |
| Specifications | |
| Length | 50 miles (80 km) (Bank collapsed in 1822) |
| Maximum boat length | 70 ft 6 in (21.49 m) (test note) |
| Maximum boat beam | 6 ft 10 in (2.08 m) (Southern section is 10'6" beam) |
| Locks | 10 (Locks 5 & 6 combined into one deep lock) |
| Maximum height above sea level | 250 ft (76 m) (Summit pound from F to G) |
| Status | restored |
| History | |
| Principal engineer | Thomas Telford |
| Date of act | 1795 |
| Date of first use | 1800 |
| Date closed | 1948 |
| Geography | |
| Branch(es) | tiny canal |
| Branch of | big canal |
{{Infobox canal
| name = Bogcaster Canal
| image = example.jpg
| image_size = 100px
| caption = Bogcaster Canal near Bogtown
| o_name = Bogcaster and Nowhere Canal Navigation
| m_name = [[Grand Amalgamated Canal]]
| company = Bogcaster Canal Company
| engineer = [[Thomas Telford]]
| a_engineer = [[Benjamin Outram]]
| date_act = 1795
| date_const = 1797
| date_use = {{Start date|1800}}
| date_comp = 1804
| date_ext = 1820
| date_closed = 1948
| date_rest = 1978–2001
| len_ft = 70
| len_in = 6
| o_len_ft = 72
| o_len_in = 6
| len_note = test note
| beam_ft = 6
| beam_in = 10
| o_beam_ft = 7
| o_beam_in = 1.5
| beam_note = Southern section is 10'6" beam
| start = A
| o_start = C
| start_note = note for start
| end = B
| o_end = D
| end_note = note for end
| branch = tiny canal
| branch_of = big canal
| join = Other canal<br />Some Canal
| locks = 10
| o_locks = 11
| lock_note = Locks 5 & 6 combined into one deep lock
| length_mi = 50
| o_length_mi = 80
| length_note = Bank collapsed in 1822
| elev_ft = 250
| elev_note = Summit pound from [[F]] to [[G]]
| status = restored
| nav = [[British Waterways]]
}}
