Difference between revisions of "Template:Infobox future infrastructure project/doc"
Jump to navigation
Jump to search
| Line 8: | Line 8: | ||
|proposer = [[Great Northern Way Campus Trust]] | |proposer = [[Great Northern Way Campus Trust]] | ||
|official website = http://www.gnwtrust.ca/ | |official website = http://www.gnwtrust.ca/ | ||
| + | |planned start = ? | ||
| + | |planned finish = ? | ||
|estimated cost = ? | |estimated cost = ? | ||
|stakeholders = [[UBC]], [[SFU]], [[BCIT]], [[Emily Carr University of Art and Design]] | |stakeholders = [[UBC]], [[SFU]], [[BCIT]], [[Emily Carr University of Art and Design]] | ||
Revision as of 18:35, 27 February 2013
| This is a documentation subpage for Template:Infobox future infrastructure project. It contains usage information, categories and other content that is not part of the original template page. |
| ? | |
| Location | Vancouver |
|---|---|
| Proposer | Great Northern Way Campus Trust |
| Project website | http://www.gnwtrust.ca/ |
| Cost estimate | ? |
| Start date | ? |
| Completion date | ? |
| Stakeholders | UBC, SFU, BCIT, Emily Carr University of Art and Design |
Usage
The template text may be copied and pasted to the article as needed. There are no mandatory fields. All fields accept text strings.
{{Infobox future infrastructure project
|property_name =
|location =
|proposer =
|official website =
|status =
|type =
|estimated cost =
|max cost =
|min cost =
|planned start =
|planned finish =
|image_name =
|image_size =
|caption =
|osm_id =
|supporters =
|stakeholders =
|opponents =
|geometry =
}}
Notes
Applicability
This template can be used to provide structured details of an infrastructure project that is planned or under construction. This is distinct from the completed project which might have its own infobox. For example a motorway may have been built and expanded in a number of separate projects - the mototway would have an infobox and the construction projects may also have separate infoboxes.
Field usage
The usage of fields and the infobox is still being discussed however here are some proposed values for fields.
- status : aspiration/planned/approved/withdrawn/shelved/under_construction/completed
- type : road/rail/airport/building etc