Template:Engineer-stub
| This article about an engineer, inventor or industrial designer is a stub. You can help Wikipedia by expanding it. |
The following parameter defines a stub category that does not exist: |category |
- Engineer-stub
- Stub
Contents
About this template
This template is used to identify a stub about an engineer, inventor or industrial designer. It uses {{asbox}}, which is a meta-template designed to ease the process of creating and maintaining stub templates.
Usage
Typing {{Engineer-stub}} produces the message shown at the beginning, and adds the article to the following category:
- Category:Engineer stubs (population: 6)
General information
This is a stub template. A brief explanation of these templates follows; for full details please consult Wikipedia:Stub.
What is a stub?
A stub is an article containing only a few sentences of text which is too short to provide encyclopedic coverage of a subject.
How is a stub identified?
- If possible, try to find the most appropriate stub template for the article. A full list can be found at Wikipedia:WikiProject Stub sorting/List of stubs.
- More than one stub template may be used, if necessary, though no more than four should be used on any article.
- Place a stub template at the very end of the article, after the "External links" section, any navigation templates, and the category tags. As usual, templates are added by including their name inside double braces, e.g.
{{stub}}.
Further information
Further information can be found at:
New stub templates and categories (collectively "stub types") should not be created without prior proposal at Wikipedia:WikiProject Stub sorting/Proposals. This allows for the proper coordination of all stub types across Wikipedia, and for the checking of any new stub type for possible problems prior to its creation.
See also
- Template:Empty section – To flag an empty section as a stub section
- Template:Expand section – To flag sections selectively as incomplete
- Template:Data missing – To flag missing information or other data
- Wikipedia:Content assessment
| This documentation is automatically generated by Module:Asbox. The general information is transcluded from Template:Stub documentation. (edit | history) |
<ATIQ UR REHMAN
M.SC. ENVIRONMENTAL ENGINEERING BSC. CIVIL ENGINEERING
engratiq7@live.com, +966-54-1159484 ¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬PERSONAL INFORMATION:
Date of Birth: 08th August, 1987 Nationality: Pakistani Total Professional Experience: More than 6 Years Key Qualifications Utilities Civil Design Engineer Professional Affiliation/ Registration: Pakistan Engineering Council Civil / 28355 KEY EXPERTISE: - Hydraulic Design of Pressurized as well as Non-Pressurized Systems
- Planning and Designing of Grading, Storm Drainage, Sewerage, Water Supply, Irrigation and Solid Waste Management systems
- Preparation of Design Study Reports, Tender Documents including Bill of Quantities & Tender drawings
- Preparation of Technical & Financial Evaluation Reports
- Well conversant with latest engineering softwares
- Preparation of Presentations, Design calculation sheets & Monthly progress reports
OBJECTIVE: A challenging job in a dynamic organization; where I can effectively contribute and enhance my skills. EDUCATION: M.SC. ENVIRONMENTAL ENGINEERING: 1ST Division 2013 University of Engineering & Technology, Lahore-Pakistan B.SC. CIVIL ENGINEERING: 1ST Division 2008 University of Engineering & Technology, Taxila-Pakistan COMPUTER SKILLS: Water Gems Autodesk Civil 3D Storm and Sanitary Analysis Sewer Gems Navisworks Micro Drainage MS Office Win-TR 55 Primavera, MS Project LANGUAGE CAPABILITY: English, Urdu and Punjabi - Good in speaking, reading and writing
¬¬¬MAJOR ACADEMIC COURSE WORK: • Studied the Wastewater pollution Parameters of Quaid-e-Azam Industrial Estate, Lahore • Designed the Combined Effluent Treatment Plant at PIE, Lahore (Case Study). • Designed the Plumbing and Fire Fighting System of NFC Building, Lahore (Course work). • Reviewed the Laboratory facilities of WASA, Lahore (Course work). • Designed a Solid Waste Management system of Allama Iqbal Town, Lahore (Course work). • Designed the structure of Multi Storey Building at Islamic University Campus, Islamabad. PROFESSIONAL EXPERIENCE: 1) Name of Employing Agency Parsons International Limited, Abu Dhabi, UAE. Title of Position Civil Design Engineer Location of Assignment Abu Dhabi UAE
Period of Assignment July 13, 2014 till date
As a Design Engineer, I rendered my services for the following projects: PROJECTS: • Currently working on “Irrigation Reservoirs and Improvements to Existing Irrigation Facilities and Associated Works inside Abu Dhabi Island”, Scope of work includes preparation of Engineer’s Estimates, Tender Documents, Technical Specifications, Bid Technical as well as Financial Evaluation and Construction Drawings. • Currently working on “Irrigation Reservoirs along Musaffah Road and at Muhammad Bin Zayed City”, Scope of work includes preparation of Engineer’s Estimates, Tender Documents, Technical Specifications, Bid Technical as well as Financial Evaluation and Construction Drawings. 2) Name of Employing Agency Saudi Consulting Services, Riyadh, KSA. Title of Position Project Engineer Location of Assignment Riyadh KSA
Period of Assignment October 27, 2013 to July 12, 2014
As a Project Design Engineer, I rendered my services for the following projects: PROJECTS: • Worked on “Subdivision & Development of Support Industrial Zone, RAS-AL-KHAIR”, Scope of work includes effective design of Grading and Storm drainage system for different phases (Industrial area, Roads and Interchanges) of project area. The total project area is about 600 hectares. 3) Name of Employing Agency National Engineering Services Pakistan (Pvt.) Limited Title of Position Engineer Location of Assignment Lahore Pakistan
Period of Assignment September 26, 2008 to October 26, 2013
As a Design Engineer, I rendered my services for the following projects: PROJECTS: • Worked on “Construction of Lakhudair Landfill Site, Lahore”, Scope of work includes design review, preparation of Engineer’s Estimate, Tender Documents, Bid Evaluation Report and Construction Drawings. Area of landfill site is about 80 hectors and total cost of this project is Rs.3 billion. • Worked on Planning and Design of Sewerage, Drainage and Water Supply System for “Multan Road Rehabilitation/ up gradation project”. Scope of work includes preparation of PC-I, Detailed Design, BOQ, Engineer’s Estimates, Tender Documents, Technical Specifications and Construction Drawings. The length of road is about 13 km and cost of the project is Rs. 4 billion. • Worked on Planning and Design of Storm Water Drainage System of “Lahore Ring Road Project – Northern Loop” having length of about 50 km. This part of project is in execution phase and remaining portion (Southern Loop, about 40 km in length) is at feasibility stage. Scope of work includes preparation of PC-I, Detailed Design, BOQ, Engineer’s Estimates, Tender Drawings & Specifications and Construction Drawings for all packages of the project. • Worked on “Metro Bus Transit System along Ferozepur Road, Lahore”, Scope of work includes Drainage and Water Supply System of Bus Corridor, Stations and allied components. • Worked on “Comprehensive Sewerage and Drainage Scheme for South Lahore”. Scope of services included preparation of Inception Report, Feasibility Report, Detail Design Report, Tender Documents, Technical Specification and PC-I. Area of this project is about 50000 acres and total cost of this project is Rs.30 billion. • Worked on “Feasibility Studies of Sewerage and Drainage Systems in Lahore and Walton Cantonment Areas”. Scope of services included preparation of Inception Report, Feasibility Report, Engineer’s Estimate, Tender Documents and PC-I of. Area of this project is about 19000 hectares and total cost of this project is Rs.8 billion. • Worked on “Detailed Engineering Design for laying of Trunk Sewer along Cantonment Drain, Lahore”. Area of this project is about 22000 hectares and total cost of this project is Rs. 3 billion. Scope of services included preparation of Detailed Design, Engineer’s Estimates, Technical Specifications and Tender Documents of the project. • Worked on “Preparation of Comprehensive Sewerage & Drainage Scheme for Allama Iqbal Town & adjoining Areas, Lahore”. Scope of services included preparation of Inception Report, Feasibility Report, Preliminary Design Report, Detailed Design Report, Engineer’s Estimate, Tender Documents and PC-I. Responsible for planning and design of the project. Area of this project is about 12000 hectares and total cost of this project is Rs.1.8 billion. • Worked on “Laying of Sewer along Allama Iqbal Road”. The length of road is about 3.5 km and cost of the project is Rs. 60 million rupees. Responsible for planning, design and preparation of Engineer’s Estimate. • Worked on “Restoration of Original Cross Section of 40 ft. of Sattukatla Drain from Ferozepur Road to PECO Road Bridge”. Scope of services included Hydraulic Design of Rehabilitated Drain, Construction Drawings of Retaining Walls, Bridges and PC-I. • Worked on Planning and Design of Sewerage and Drainage System for “Lahore Road Rehabilitation Project Phase-II”, which included fifteen main roads of Lahore. The Scope of services included preparation of Detailed Design, Engineer’s Estimates, Tender Documents and Construction Drawings. • Worked on “Vetting of Structural Design of Railway Drain (Remaining Section)”. Scope of work included vetting of hydraulic and structural design of Railway Drain. • Worked on “Vetting of design of proposals of 32 nos. Schemes for Reduction of Stagnation Period of Rain Water at Sore Points / Ponding areas in Lahore”. Responsible for vetting of design proposals submitted by WASA. • Worked on “Engineering Studies for Area Development scheme of LDA Mustafa Town, Lahore under Lahore Rehabilitation Project Phase-II Lahore”. Later on this project was merged into “Multan Road Rehabilitation/ up gradation project”. • Worked on “Detailed design of Drainage Disposal Station at Mahmud Booti, Lahore.” • Worked on “Design and Rehabilitation of Drainage System of Flyover at Ghardi Shaho near UET, Lahore”. The scope of responsibilities includes preparation of PC-I, Tender Documents and Construction Drawings. • Worked on “Design of Drainage System of Underpass at Abdullahpur Chowk, Faisalabad”. Scope of work includes preparation of PC-I, Tender Documents and Construction Drawings. • Worked on “Design of Drainage System of Flyover at Gujranwala”. The scope of services included preparation of Engineer’s Estimates and Construction Drawings. DESCRIPTION OF DUTIES: Worked on the Planning and Design of different Projects, main activities included Preparation of Design Methodology, Financial Proposals, Inception Report, Feasibility Studies, Project Planning, Preliminary and Detailed Engineering Design, PC-I, Engineer’s Estimates, Tender Documents and Bid Evaluation Reports. Maintenance of Project Record as per QMS (Quality Management System) and Preparation for Internal as well as External Audit conducted by Moody International. Designed Storm water Drainage System including Lift Stations by using different Computer software like SWMM, WinTR-32 and EXCEL Spread Sheets. Designed Sewerage Systems including Hydraulic Design of Pipe, Conduit and Disposal Stations by using EXCEL Spread Sheets and performed Life Cycle Cost Analysis based on currently available Pumping Machinery and different arrangements used in Pumping Stations. Designed Landfill sites including Lift Stations and allied components to minimize the negative impacts on environment. Designed Water Supply Systems by using WaterGems and EPANET. Prepared Technical Specifications, Construction and Tender Drawings for different cities by using relevant Design Standards. Coordination with clients and site staff regarding site queries in relation with design Inputs. Presentations to personnel of various Government agencies/departments regarding various projects. 3) Name of Employing Agency CDM Pak (Pvt.) Limited Title of Position Trainee Engineer Location of Assignment Lahore Pakistan
Period of Assignment June 30, 2008 to September 25, 2008
Worked as a Trainee Engineer on the following assignments; • Replacement of Fossil fuel by Biomass for Steam Generation at Kohinoor Textile Mill. • Replacement of Fossil fuel by Biomass for Steam Generation at Master Textile Mill. DESCRIPTION OF DUTIES: Assisted my team leader in Collection, analysis and interpretation of baseline data, estimation of emission factors of Green House Gases, financial analysis of different alternatives and preparation of Project Design Documents (PDD) in above stated CDM projects APPRECIATION OF WORK: • For the years 2010-2011, 2011-2012 & 2012-2013 in NESPAK, the Management appreciated my Professional services and Head of EPHED, NESPAK awarded “Letter of Appreciation” on all occasions. CERTIFICATION/ ACHIEVEMENT: • “Art of Management” certification from Swiss eLearning Institute (Swiss Management Centre, Kuala Lumpur dated March 04, 2012). PROFESSIONAL TRAINING AND DEVELOPMENT: • Attended training on “Micro Drainage” conducted by XP Solutions, Riyadh, KSA- 2013. • Attended training on “Sanitary and Storm Analysis” conducted by Shiva Dhawan, Senior Infra Engineer at Autodesk, Riyadh, KSA - December 15&16, 2013. • Attended and represented Pakistan at the International Conference on “Engineering and Entrepreneurship” held in Abu Dhabi - June 7, 2012. • Attended training on “Focussing Time and Project Management” - March 15, 2012. • Attended the KSB Pumps Presentation/ Workshops organized by KSB, Pakistan - 2011. • Attended training on “Primavera for beginners” - October 11, 2010. • Participated in workshops on “Use of uPVC, PVC, PPR and Asbestos Pipes” - April 4, 2009 • Attended training on “Advance Technology Workshop” conducted by GRUNDFOS, Pakistan - December 18, 2008. >