63rd Street Tunnel
- ... that the 63rd Street TunnelTemplate:`s upper level took 20 years to open, while the lower level is still under construction after nearly a half-century? Source: NY Times 1969 (start of construction), NY Times 1989 (completion), NY1 2017 (laying track in lower level)
- ALT1:... that the 63rd Street TunnelTemplate:`s upper level opened 20 years after its construction started, while the lower level is still under construction after nearly a half-century? Source: Same as above
- ALT2:... that unlike other underwater subway tunnels in New York City, the 63rd Street Tunnel was prefabricated and sunk into trenches in the river bed? Source: NY Times 2005
Improved to Good Article status by Epicgenius (talk). Self-nominated at 00:26, 20 September 2019 (UTC).
- Lua error: expandTemplate: template "y" does not exist.
- Template:Ping Any update on the QPQ? Ergo Sum 13:41, 27 September 2019 (UTC)
- Template:U, I hope to get to it by this weekend. I have another article that I want to nominate for DYK, so it would be better to do all the QPQ's at once. epicgenius (talk) 15:48, 27 September 2019 (UTC)
- Template:Re I've done a QPQ. I also added "after nearly a half-century" to ALT0 + 1. epicgenius (talk) 00:27, 28 September 2019 (UTC)
- Template:U, I hope to get to it by this weekend. I have another article that I want to nominate for DYK, so it would be better to do all the QPQ's at once. epicgenius (talk) 15:48, 27 September 2019 (UTC)