Template:Infobox power transmission line/testcases
< Template:Infobox power transmission line
Jump to navigation
Jump to search
Revision as of 00:46, 30 January 2018 by imported>Marchjuly (Removed non-free file being used in the template namespace per WP:NFCC#9)
| This is the template test cases page for the sandbox of Template:Infobox power transmission line. Script error: No such module "Purge". to update the examples. If there are many examples of a complicated template, later ones may break due to limits in MediaWiki, see the HTML comment "NewPP limit report" in the rendered page. You can also use Special:ExpandTemplates to examine the results of template uses. You can test how this page looks in the different skins with these links: |
| Test1 | ||||
|---|---|---|---|---|
{{Infobox power transmission line|param1|param2|...|name3=value3}}
{{Infobox power transmission line}}
{{Infobox power transmission line/sandbox}}
| ||||
| Test2 | ||||
|---|---|---|---|---|
{{Infobox power transmission line|param1|param2|...|name3=value3}}
{{Infobox power transmission line}}
{{Infobox power transmission line/sandbox}}
| ||||
| EuroAsia Interconnector | |
|---|---|
| File:Euroasia-route-map.jpg Script error: No such module "If empty". | |
| Location | |
| Country | Israel Cyprus Greece |
| From | Hadera,Israel |
| Passes through | Kofinou,Cyprus Korakia,Greece |
| To | Attica,Greece |
| Ownership information | |
| Owner | EuroAsia Interconnector Ltd. (CEO: Nasos Ktorides) |
| Key people | hhhhhh |
| Partners | ooo |
| Construction information | |
| Expected | Cyprus-Israel 2019 Crete-Athica 2020 Cyprus-Crete 2022 |
| Technical information | |
| Type | Submarine power cable |
| Type of current | HVDC |
| Total length | 1,520 km (940 mi) |
| Power rating | 2,000 MW |
| DC voltage | ±500 kV |
| No. of poles | 2 |
| Website | http://www.euroasia-interconnector.com/ |